Vast partnered with Hacer to bring this state-of-the-art facility to life on a greenfield site. The office and warehouse project was completed six weeks ahead of schedule and comprised different construction and electrical elements including alucobond cladding, glazed curtain walling and precast concrete panels with an artistically designed staircase in the foyer.

The lighting design highlighted the building’s stunning staircase, with feature strip lighting installed along the steps. The same lighting was applied throughout the building to maintain the flow of the design.